Posts

Showing posts with the label Energy-Industry-Economic Times Faster commissioning likely for solar projects

Faster commissioning likely for solar projects http://bit.ly/2Npeyu0

Image
Faster commissioning likely for solar projects http://bit.ly/2Cvwa38 The commissioning schedule for a solar project is currently 21 months from date of execution of the PPA for those being set up within a solar park, and 24 months for projects of over 250 MW elsewhere. http://bit.ly/2Npeyu0 September 05, 2018 at 08:08AM Energy-Industry-Economic Times http://bit.ly/2vJXaWq