Posts

Showing posts with the label Energy-Industry-Economic Times Operational and connectivity issues pull down RIL CBM block output

Operational and connectivity issues pull down RIL CBM block output http://bit.ly/2RnqEm9

Image
Operational and connectivity issues pull down RIL CBM block output http://bit.ly/2PZOTdo Production at RIL’s CBM block in Madhya Pradesh contracted to 0.94 million metric standard cubic meters a day (mmscmd) in July-September from 1mmscmd in the April-June period. http://bit.ly/2RnqEm9 November 27, 2018 at 07:52AM Energy-Industry-Economic Times http://bit.ly/2vJXaWq