Gas allocation mechanism for power generation units in the works http://bit.ly/2qnMTfJ
Gas allocation mechanism for power generation units in the works http://bit.ly/2QhC1vn
India has currently nearly 25,000 mw of operational gas-based capacity, all of which is stressed because of gas unavailability. http://bit.ly/2qnMTfJ November 01, 2018 at 04:07PM Energy-Industry-Economic Times http://bit.ly/2vJXaWq
Comments
Post a Comment